Technical conditions for connecting electricity. Electricity connection documents

Technical conditions for power supply must be obtained when connecting objects to power grids. Also, technical specifications are required when the level of energy consumption changes. LLC "Stroy-Proekt" offers qualified assistance in resolving this issue.

Receiving technical conditions for connections to utility networks is necessary to determine the category of reliability of power supply, power of energy consumers, voltage indicators and connection points. TU in Moscow is provided only by licensing and inspection organizations:

  • Rostekhnadzor;
  • JSC "Mosenergosbyt";
  • JSC "MOESK".

The specialists of the Stroy-Proekt company are ready to arrange papers for expert analysis as quickly and efficiently as possible. Before submitting documents, they are edited.

Prices for obtaining TU

The procedure for obtaining technical specifications for power supply

The company operating the power grids determines and provides the technical specifications within 14 working days from the date of receipt of the request. In case of refusal, the decision must be motivated. To verify the validity of a negative answer, the applicant applies to the authorized federal authority for technological supervision.

The cost of obtaining technical specifications is assigned by the network organization. When buildings that are being commissioned for the first time are connected to the power grids, the scope and principle of distribution of work tasks between the parties signing the contract are determined. Also, obtaining technical specifications is necessary when improving the electrical installations used.

Required documents

The owner of the facility connected to the power grid must submit an application. It must indicate:

  • full name, functional purpose and address of the building or premises;
  • previously installed capacity and one-time load;
  • the element of the electrical network to which the connection is planned;
  • already allocated and requested additional capacities and their target distribution between the main consumer and sub-subscribers;
  • the name of the developer and investor;
  • start date construction works and putting the facility into operation;
  • requirements for the reliability of power supply to receiving devices;
  • nature of the load and special conditions.

As an attachment to the application for obtaining a technical specification, they provide:

  • situational plan land plot or premises on a scale of 1: 2000;
  • copy of your passport;
  • a certificate from the energy sales company about the absence of debt;
  • a copy of an extract from the technical passport of the BTI;
  • a copy of the certificate of ownership;
  • written approval of additional capacities with the owner of the power grids.

LLC "10 kilovolt" has been engaged in this type of activity for several years, so you can safely contact us for help. Below is a table showing prices for all types of services provided. Our connection rates:

Price list for connecting electricity
Job title Unit rev. Price, rub.)
1 Turnkey electricity connection for individuals. persons (excluding materials) PCS. 60000
2 Materials and their purchase (standard 15 kW) PCS. 20000
3 Documents and works over 15 kW for physical and legal. persons (negotiable) PCS. from 60,000
By stages
4 Conclusion of an agreement for technological connection and obtaining technical specifications (enhanced control of the application) PCS. 10000 5 Implementation of technical specifications (installation work) PCS. 25000 6 All approvals for the construction of the power grid and delivery to the power grid inspector / energy supervision, power supply contract, subscriber book, personal account PCS. 30000 7 Simplified wiring diagram (single-line, without approvals) PCS. 3000

Connection of electrical installations of consumers to the power grid is carried out only on the basis of an act of approval for the production of this connection. You can get an admission to connect both the entire electrical installation and one of its component parts - everything will depend on the terms of the connection agreement.

Electrical installations, regardless of whether they are new, reconstructed or modernized, must comply with the requirements of regulatory enactments, as well as project documentation... In addition, they must have all the necessary documentation and are equipped with protective equipment against electric shock.

The admission, which permits the production of work on the connection of the electrical installation, is issued by the same organization that issued the technical conditions for the connection of electricity.

For electrical installations in which equipment of foreign production is used, which is subject to certification, such a certificate is required. This certificate must meet the requirements in force in Russian Federation standards.

In order to obtain an act of admission to connect the electrical installation to the network, the customer must apply in writing to the organization in charge of the electrical network. Application for connecting electricity should also contain:

  1. Electrical connection specifications and a certificate from the organization that issued them and connected them.
  2. Design documentation that is approved accordingly.
  3. Single-line wiring diagram for electrical installations.
  4. An act that delineates the balance sheet ownership and operational responsibilities of the parties.
  5. Information about what means of electricity metering are installed, and in the case of the presence of differentiated metering means, a protocol for their parameterization.
  6. Acceptance certificate, which must be signed by the construction, installation and commissioning organization.
  7. A protocol, which will confirm the verification of knowledge and an order for the appointment of a person responsible for the electrical industry (or a contract for the maintenance of an electrical installation of organizations that has the right to perform such work).
  8. List of persons who, on behalf of the customer, have the right to submit applications for disconnection and connection of electrical installations.
  9. Executive schemes and acts for work.

Video: technical conditions for connecting electricity

The cost of technical conditions (TU) for connecting electricity

Observing all these points electricity connection application will be drawn up correctly, but if the application was drawn up incorrectly, and not all the necessary documentation was provided, then the technical check of the object will not be carried out, and comments, within 5 working days, are sent in writing to the customer.

If all the documentation is in order, then a special commission checks the compliance of the technical documentation with the current devices

After all the checks have been made, an act of admission is drawn up for the production of connecting this electrical installation to the network. In other words, this act gives electricity connection permit to the electrical installation. The act is drawn up in two copies, one of which is transferred to the customer, and the second is stored in the structural unit that carried out the check.

In the event that the electrical installation is not ready for operation, an act of refusal to grant the right to connect the electrical installation to the network is drawn up and a list of violations is indicated.

After providing the customer with a list of deficiencies, he is obliged to eliminate them, and only after that a re-examination of the facility for which the electricity connection is being drawn up can be assigned.

Sometimes it happens that an object that is an electrical installation has several owners, in this case, documents for connecting electricity will be issued only after the conclusion of an agreement with all owners. In the event that it is necessary to conclude an agreement for only one of them, there must be the written consent of the rest, which must be certified by a notary.

Everybody knows well what to collect everything Required documents it can be very difficult - the paperwork in our country is still ineradicable. You have to go through each office not even for several hours, but for several days, but in fact very often there is simply no time, and the "acceleration" of the process can undermine any budget. In this case, connections and established channels help, through which everything happens much faster. Such connections are possessed by those who constantly deal with these issues, and the whole process goes much faster for them than for those who do it for the first time.

You should not be bad about intermediaries, because very often cooperation with such companies will not only save time, but in some cases it may be even cheaper than collecting all the documents yourself.

Our organization will help you collect the entire package of documents for connecting electricity (we will help you to draw up an application correctly, obtain a permit, etc.). Thanks to our extensive experience in connecting electricity to facilities, we will complete all documents for a reasonable price and as soon as possible.

We connect electricity in areas: Mytishchi, Odintsovo, Shchelkovo, Podolsk, Pushkino, Balashikha, Krasnogorsk, Korolev, Kotelniki, Lenino, Lobnya, Lytkarino, Lyubertsy, Domodedovo, Dzerzhinsk, Ramenskoe, Reutov, Vidnoe, Yubileiny, Khimki, Zhelezniy, Ivanteevka Zhukovo. Submit an application for connecting electricity.

  • Laying the cable in the trench

      Gasket types:

  • Geodetic services
  • Installation of electrical equipment and networks
  • Electrical laboratory services
  • Obtaining technical conditions (TU)
  • Technical conditions (TU) for connecting electricity is a document that establishes a list of technical requirements that must be met in order to connect to electricity networks, increase the power consumption limit, etc.

    Obtaining technical specifications is the first stage in such a long procedure as connecting to power grids. Without this document, it is impossible to neither develop nor connect the power supply at a residential or commercial property. Its registration must precede the design of networks and the creation of new power supply schemes, and all the requirements specified in the document must clearly comply with interstate and state standards... Obviously, it will be difficult to do without the support of a specialist. The company LLC "Firm Starling and K" is always ready to help.

    The cost of the service of obtaining technical specifications for power supply

    The amount that it will cost to receive technical specifications through us depends to a greater extent on the power of the connected network, and only secondarily - on the nature of the applied subject (it is cheaper for individuals). You can see our rates in the table below. They are approximate - the exact figure is always determined individually, taking into account the specifics of the request and the discounts and special offers valid at the time of the application.

    How is the technical specification for the connection of electricity obtained?

    You can get the TU in Moscow and the Moscow region on your own, but this document is one of the most standardized, there should be no mistakes in its execution. Otherwise, there may be electricity problems in the future. Therefore, think carefully, do you want to understand all the nuances of this procedure? Are you ready to spend time collecting documents on your own, filling out an application, contacting JSC “MOESK”?

    You can and should entrust us with obtaining technical specifications for connecting the power supply. Representing the interests of clients, we act according to a long-established scheme, so the whole process takes a minimum of time. All you need to do is provide the following data:

      Sources of electricity,

      Attachment points,

      Power consumption,

      Calculated values ​​of currents,

      Liability limit,

      All requirements of your electricity supplier (before receiving the document),

      Verification calculations of cable and additional equipment (switches, transformers, meters, fuses, etc.).

    We will also need:

      The purpose of the object or room,

      Official location (for CJSC or LLC legal address),

      The time of putting the object into operation,

      Calculation of the predicted power (the required number of kW and the category of power supply reliability).

    Obtaining technical conditions for power supply through us takes place in several stages:

      Providing a description of the object, collecting documents. Do not think that there are insignificant details here, do not limit yourself to general phrases. The more detailed your description is, the better.

      Document development. The basis for it is GOST 2.114-95 and GOST R. 51740. In the first, general rules for design documentation, and in the second - particular requirements for design. It will be difficult for non-specialists to figure it out.

      Coordination and approval. At this stage, there is an agreement both with the inspection authorities and with the customer.

    By entrusting this work to us, you will save the most important thing in life - time, which is much more valuable than the money spent. It is profitable to receive TU with us!

    Application and list of documents for obtaining TU

    LLC "Firma Starling and K" takes care of all the worries when our clients achieve such a goal as obtaining a technical specification for power supply. We provide comprehensive assistance and support at all stages of work, starting with contacting us and filling out an application. By the way, a sample application form is presented on our website for review.

    In addition, you will also need the following documents:

      location plan of all power receiving devices to be connected;

      documents confirming the location of the property objects of JSC “MOESK” with the smallest distances from the territorial border;

      single-line diagram of the applicant's power grids with a voltage class of 35 kW or more, which must be connected. Possibility of redundancy, generation of loads is indicated;

      title documentation for a given object;

      constituent documents;

      documentation confirming the powers of the applicant.

    Please note that the composition of the documents may vary depending on whether the entity is a legal entity or an individual, as well as on the capacity of the connected network. The above list of documents for obtaining technical conditions for connection is approximate. We can determine the exact list when you contact us.