What is civil and industrial construction? Industrial engineering

Industrial engineering- a rather difficult type of construction. Construction industrial facilities implies presence in the state construction company specialists of various profiles. At the same time, only coordinated work of all sections allows the work to be completed on time, which is especially valued in industrial construction.

What's happened industrial engineering? This is the construction or restoration of objects that are in one way or another connected with production, industry and business in general. Our company will be engaged in the construction of enterprises in the fuel, chemical, and petrochemical industries.

Industrial construction is in demand in any environment economic situation. Industrial engineering- new jobs and business development. This process includes not only the construction of buildings from scratch, but also major repairs ready-made industrial production facilities.

Construction organizations that are engaged in industrial construction must have all the necessary permits and licenses to carry out their activities. This confirms their high organizational and professional level.

Quite often, such a construction organization has its own division for designing industrial facilities. All construction organizations involved in industrial construction employ high-level professionals.

Specificity requires this. Even before the start construction stage it is necessary to provide for all possible negative factors affecting the buildings being built. This influence is inevitable during the production process. The construction process itself requires special skill. Industrial engineering requires absolute compliance with all technological standards. Otherwise, the industrial building will be subject to rapid destruction and unsuitability for further use.

We are a multidisciplinary organization, so you can order from us all the work for the implementation of industrial construction.

The construction of prefabricated buildings is becoming an increasingly popular method for the construction of not only temporary structures, but also permanent industrial and commercial premises. The most common type of design of prefabricated buildings is the construction of buildings from light metal structures using awning fabric or sandwich panels. The advantage of prefabricated buildings is low cost and speed of installation. Quick commissioning of a building is achieved due to the unification of the building construction process and the ease of installation of prefabricated buildings. Installation of buildings includes: installation of a foundation, installation of a load-bearing metal frame, fastening of enclosing structures from building panels, installation of roofing.

Designers, engineers and builders can solve any assigned tasks for the construction of cottages. The business card of our construction company is a creative, but at the same time serious approach, respect and individual approach to every client, high level organization of all construction work. IN modern life, when more and more new technologies constantly appear, construction industrial buildings plays a very important role. They are intended to accommodate various factory premises, as well as office premises, which should provide people with the necessary conditions for work.

Project implementation timeframe: 2012 - 2013

Customer: State Public Institution "GUSKK"

General contractor: VIS Group

Construction of facilities for the 2014 Winter Olympics in Sochi has become the most important project for the whole country. We are proud to acknowledge our involvement in this most prestigious construction project. The Olympics are not only the most modern sports complexes and stadiums, but also the most complex engineering infrastructure, without which the competition would not be possible. The Group's participation in the Olympic project consisted of the construction of several infrastructure facilities.

Main water pipeline from the water intake of the Mzymta River to the water intake of the Psou River

The project included design, survey and construction work for laying a water pipeline intended to supply water to the Olympic facilities of the Coastal Cluster.

The 11 km long water pipeline is divided into lower and upper branches passing through the Lower Imereti Lowland. From the top, water is supplied to the coastal Olympic village and to the Ice Arena for figure skating. The lower line passes through the territory of the Olympic Park.

The route is laid in such a way as to loop water intakes on the Mzymta and Psou rivers with the Olympic Park, thereby ensuring a reliable supply of sports and infrastructure facilities built in the Imereti Lowland. The main water pipeline in the Imeretinskaya Lowland supplies water to the Olympic venues of the Coastal Cluster: the Fisht stadium, the Bolshoi Ice Palace, the Shaiba Ice Arena, the Ice Cube Curling Center, the Iceberg Winter Sports Palace and the Adler Arena.

Thanks to the specialists and builders of the VIS Group, water was supplied to all ice stadiums ahead of schedule. This made it possible to successfully hold test competitions in figure skating, curling and speed skating a year before the start of the Olympics.

Medium pressure gas pipeline to the Rosa Khutor ski resort

The gas pipeline, whose length is 7.835 km, supplies gas to the mountainous Olympic Village. It runs from an altitude of +546 m to an altitude of +1153 m above sea level. The group carries out a full range of design, survey, construction and installation works.

The gas pipeline is made of polyethylene pipes laid in the ground and steel pipes laid along technological transitions. In total, 12 technological crossings through water and other barriers were built along the gas pipeline. The largest of them are through the Shumikhinsky Stream (length - 66 m) and through the Sulimovsky Stream (length - 111 m). The weight of the bridge crossing over Sulimovsky Stream is over 200 tons, its installation was carried out according to a specially developed project using the “sliding” method.

Construction was carried out in difficult mountain and climatic conditions in a short time. As part of the project, engineering protection of slopes was carried out, namely the construction of concrete retaining walls on a pile foundation with a total length of 436 m with a concrete volume of 3030 m3. Slopes were also protected with geogrid - 1223 m2.

Water pipeline from the main network of the village. Krasnaya Polyana to the Olympic venues of the Rosa Khutor plateau

The route of the high-mountain water pipeline runs along a mountain range 40 kilometers from Sochi. The specificity of this unique hydraulic structure is that it was laid in a mountainous area in cramped conditions using two pipeline threads. A particular difficulty during the construction of the facility was the large difference in heights; in some areas it is 270 m. For example, the water intake is located at an altitude of 550 m above sea level, and the highest point in the construction of the water pipeline was 1130 m. In these conditions, in some areas it is difficult It was necessary to use construction equipment, so the excavation and laying of pipes was carried out by workers manually.

Also due to the difference in height between extreme points The water pipeline created extremely strong water pressure of 40 atmospheres. Experts have developed a technical solution that allows extinguishing excess water pressure to a standard level of 16 atmospheres. For this purpose, more than 70 different wells and chambers equipped with modern hydraulic equipment are located along the entire length of the water pipeline.

The constructed water pipeline fully provided the athletes and participants with Olympic Games in Sochi with clean drinking water.

The project was implemented in three stages:

Stage 1. Construction of a 3 km long route from the water intake to the Mountain Olympic Village of the Rosa Khutor ski resort.

There are three water pumping stations on the site, equipped with high-tech equipment that operates without the presence of personnel. The task of this section was to supply water for construction and installation work at the Rosa Khutor facility before the main water pipeline was put into operation and during the test competitions that took place in December 2012 - January 2013. After the main water pipeline is put into operation, this line provides a reverse supply of water to ensure the life of the ski resort facilities.

Stage 2. Water supply from the main water pipeline of the village of Krasnaya Polyana at an elevation of +550 m to the Mountain Olympic Village "Rosa Khutor" at an elevation of +1150 m above sea level.

The length of the route is 6 km. Most of it runs in the same corridor with the medium pressure gas pipeline. This section includes technological crossings through three water barriers: Sulimovsky, Shumikhinsky and Rzhanoi streams. Length of technological transitions: 111 m, 66 m and 20 m, respectively. For uninterrupted operation of the water pipeline, 6 pumping stations were built along the route, operating in automatic mode without the presence of staff. They are controlled from the Krasnaya Polyana control center via a GSM/GPRS wireless communication channel. The power supply to the pumping stations is carried out from five newly built transformer substations connected by cable lines with a total length of over 40 km.

Slope protective structures in the form of concrete retaining walls on a pile foundation were erected along the water pipeline route. Their total length is 365 m. The water pipeline is also protected from landslides and avalanches by gabion structures (retaining walls made of wire frames filled with stones). Their length is 673 m, the volume of stone mass is 10,648 m3.

Stage 3. Construction of a 1 km long route from the water intake in the floodplain area of ​​the Mzymta River to the lower Rosa Khutor base with the installation of wells and a connection chamber.

Krasnaya Polyana water pipeline - “Mountain Carousel”

The objective of the project is to create an extensive water supply system to supply consumers. At the site, the Group carried out a full range of design, survey, construction and installation works.

The length of the line is 2.8 km. The water pipeline is intended to provide water to the sports and tourist complex “Gornaya Karusel”. The route runs parallel to and in close proximity to the route of the tourist funicular. This water pipeline is an integral part of the projected centralized water supply system for consumers of the Krasnopolyansky settlement district and Olympic venues located on the northern slope of Mount Aibga.

The route of the water conduit runs from the point of insertion into the main water conduit at an elevation of +540 m above sea level, crosses the Mzymta River, on its left bank passes under the railway and along the northern slope of Mount Aibga reaches the Sports and Tourist Complex "Mountain Carousel" at an elevation of +960 m above sea level. At the same time, on the slope, the water conduit is located along the edge of the clearing, 17-18 m west of the axis of the existing cable car.

The structure is a steel pipeline with a total length of 2.2 km, laid in two lines underground with two booster pumping stations and two storage tanks clean water per 500 cubic meters The electrical part of the project contains four sections of a 10 kV cable line with a total length of 6.3 km with the installation and connection of three transformer substations at the pumping station sites and the tank site.


building height
78 m

area covered with natural stone
5000 m2

double glazing area
over
10,000 m2

more 250 km
cable lines

Project implementation timeframe: 2006 – 2011

Customer: Gazprom dobycha Orenburg LLC

General contractor: VIS Group

In 2011, the Group commissioned the Gazprom Dobycha Orenburg complex of buildings, which included the Gazovik Palace of Culture and Sports and an industrial medicine clinic.

The complex is unique in its design features and meets the most modern standards in architecture and equipment. Exactly this high building in Orenburg, which became a real decoration of the city.

The Gazovik Palace of Culture and Sports includes:

· Seven gyms;

· Two swimming pools;

· Three ballet halls;

· More than ten studios for amateur artistic activities;

· Large gaming hall with stands for 227 seats with modern coverage;

· Winter garden with an area of ​​more than 1,200 square meters.

building area
15,925 m2

More 900
INTILED lamps

Project implementation timeframe: 2009 – 2012

Customer: Gazprom Dobycha Noyabrsk LLC

General contractor: VIS Group

The building constructed by the Group consists of a five-story block with an atrium and a two-story block connected by a passage. The complex includes a company office, an underground parking lot, a medical center with a dental office and a cultural and recreational area. The total area is about 16 thousand square meters. meters.

The viability of the complex is ensured by a 1000 kVA transformer substation, as well as a 1000 kW diesel power plant. An electronic premises management system (“smart home”) allows for centralized monitoring of building life support systems (heating, air conditioning, security).

The VIS Group completed a full range of construction and installation works in accordance with the established schedule, despite working in the difficult climatic conditions of the Far North.

land area
76,905 m2

8400 m2
paved with granite tiles

Project implementation timeframe: 2010

Customer: Administration of Yaroslavl

Project investor: Gazprom"

General contractor: VIS Group

General designer: VIS Group

The project was implemented for the 1000th anniversary of the founding of the city.

As part of the project, a comprehensive improvement of the Strelka territory was completed confluence of the Volga and Kotorosl rivers:

  • Construction of the "Central Promenade"
  • Bank protection of the Kotorosl River,
  • Granite paving of the lower tier of the Lower Embankment from Strelka to the River Station and the pedestrian zone of the Volzhskaya Embankment,
  • The stairs to the Assumption Cathedral, staircase descents and rest areas of the Lower Embankment on the section from Strelka to the River Station are lined with granite.

In addition, the project included repairing the fountain, as well as adjusting the existing one and installing additional lighting for the Strelka area, including decorative lighting for the sculptural group and the Central Promenade.

The project was completed in a very short time and was highly appreciated by the regional leadership. The grand opening of the embankment took place with the participation of D. A. Medvedev.

land area
6059 m2

6000 m 2
lined with pink granite

150,000 t
sand was poured into the embankment structure

Project implementation timeframe: 2007 – 2010

Investor: Gazprom"

Customer: Administration of Astrakhan

General contractor: VIS Group

The project was implemented for the 450th anniversary of Astrakhan.

The embankment area has been significantly expanded and divided into zones: the Ceremonial Square near the Wedding Palace and a 1.5 km long walking and play area.

The following work was carried out as part of the project:

  • New created landscape design;
  • Fountains were built, sculptural compositions were installed;
  • The embankment is lined with pink granite.

The reconstruction and improvement of the embankment were carried out using original creative and constructive solutions from designers, architects and builders.

V.V. took part in the grand opening of the reconstructed embankment. Putin.

tower height
180 m

240
linear color-dynamic RGB spotlights

20 000
LED multi-colored lamps

Project implementation timeframe: 4 sq. 2009 – Q3 2011

Customer: NGO "Fund for preparations for the celebration of the 450th anniversary of the founding of the city of Astrakhan."

Investor: Gazprom"

General contractor: VIS Group

The project was implemented for the 450th anniversary of Astrakhan and has no analogues in Russia.

The lighting system of the TV tower in Astrakhan (height with spire is about 180 m) was made taking into account world experience in architectural lighting design engineering structures using the latest generation lighting devices.

The following main works were completed as part of the project:

  • Installation of all-weather anti-aircraft searchlights;
  • Conducting subsystems of color-dynamic LED RGB spotlights for “light flooding” of the tower;
  • Installation of a “belt-light” subsystem of 20 thousand LED multi-colored lamps.

3199 m 3
concrete

51 t
metal structures

326
piles

Project implementation timeframe: 2011 – 2013

Customer:

General contractor: VIS Group

The wedding palace, called the "House of Life", is a high-tech three storey building with a total area of ​​more than 4000 sq. m. Within the walls of the registry office there are two marriage registration halls, equipped with an original system for video recording and broadcasting images of wedding ceremonies, the rooms of the bride and groom, as well as the entire city archive.

The interior space of the building is made according to a specially developed design project: in the center of the ceremonial hall with an area of ​​197 sq. m there is a fountain in the shape of intertwined rings, and the central atrium is crowned with a lamp of more than 1,500 lamps. All the splendor of the architects’ and designers’ plans allows you to appreciate the panoramic elevator installed in the building.

The project used original finishing materials, for example, parquet from the Italian master Bertli. The walls inside the building are decorated with tapestries. At the entrance to the Wedding Palace there is a wrought-iron carriage in which newlyweds can take photographs as a souvenir.

“House of Life” meets all modern safety and comfort requirements. The building has automatic system management of the life activity of the complex, monitoring the functioning of all communications, which, in turn, reduces the volume of consumption of utility resources.

The city's first civil registry office, the appearance of which residents have been waiting for all 37 years of the existence of the settlement of gas producers and builders, has become one of the attractions of New Urengoy.

building area
10,215 m2

5333 m 3
concrete

115 t
metal structures

Project implementation timeframe: 2011 – 2013

Customer: State Public Institution "Directorate" capital construction and investments in the Yamal-Nenets Autonomous Okrug"

General contractor: VIS Group

The Center for the Prevention and Control of AIDS is a high-tech medical institution equipped with the most modern equipment. The project provides for a high level of automation and dispatching of all engineering systems. Technologies are used here that ensure high energy efficiency of both equipment and design solutions. The requirements for access of people with limited mobility are taken into account.

The main building of the Center houses a hospital for 50 people, a laboratory complex, and a maternity ward for infected mothers. Here hepatitis B and C will be additionally treated, as well as various types of allergies. The new medical facility will be supported by 274 specialists.

The group completed a full range of construction and installation works in accordance with the established schedule. Additionally, landscaping of the surrounding area was carried out.

built-up area
18,784 m2

9652 m
utility networks

Project implementation timeframe: 2009 - 2011

Customer: Gazprom Dobycha Astrakhan LLC

General contractor: VIS Group

As a result of the implementation of the project, the territory of the health center was divided into several functional zones - administrative, sports and two zones for living of children of senior and junior school age.

The Group’s specialists also built a multifunctional sports and entertainment center with a cinema and concert hall, an indoor sports complex, a canteen, a library and an Internet cafe.

The center has a summer theater, indoor and outdoor swimming pools, and sports grounds. A dance floor, a fire pit, and a fountain appeared. Construction was also completed in accordance with the master plan administrative building, houses for staff accommodation and landscaping.


built-up area
2451 m2

5533 m 3
concrete

56 t
metal structures

413
piles

Project implementation timeframe: 2011 – I quarter 2014

Customer

General contractor: VIS Group

The project is a 3-story building of an unusual architectural form - two rectangular buildings are connected by a central atrium, which houses a library and a cinema and concert hall designed for more than 220 people. The top of the atrium is crowned with a decorative metal dome.

The left wing of the school is also made using non-standard architectural solutions - the building in the form of a glass cone includes a small hall for demonstration performances and music classrooms. In the right wing there are halls for classical, historical, everyday and modern dances. Adjacent to the rehearsal hall for academic concerts is a recording studio, a costume room and a spacious warehouse for decorations.

In addition to the construction of the school building itself, the project included landscaping of the vast surrounding area:

  • Central Alley of the School of Arts;
  • Exhibition area with lawns and flower beds;
  • Parking for 59 cars for guest transport and staff.


built-up area
4218 m2

4624 m 3
concrete

628
piles

Project implementation timeframe: 2013

Customer: State Public Institution "Directorate of Capital Construction and Investments of the Yamal-Nenets Autonomous Okrug"

General contractor: VIS Group

The group acted as the general contractor for the construction kindergarten in the village of Tazovsky, Yamalo-Nenets Autonomous Okrug. The building is designed for 240 children, including places for children with delayed mental development and serious speech impairments.

The kindergarten building housed classrooms, gymnastics, music and sports halls, and a swimming pool. Improvement of the surrounding area was carried out, including the construction of walking verandas, modern children's playgrounds, small architectural forms and landscaping of lawns.


built-up area
6594 m2

building area
15,397 m2

586 m 3
concrete

223 t
metal structures

775
piles

Project implementation timeframe: 2011 – 2014

Customer: State Public Institution “Directorate of Capital Construction and Investments of the Yamal-Nenets Autonomous Okrug”

General contractor: VIS Group

The Sports Palace includes a universal team sports hall and a swimming pool with a ski jumping bowl. The total area of ​​the sports complex is about 7,000 m².

According to the designers' plan, the building consists of three spatial volumes of different number of floors. The volumes of the premises of the sports hall, swimming pool hall, spectator area block, administrative and utility and auxiliary premises are highlighted. The complex includes a universal sports hall for volleyball, basketball, mini-football, as well as two swimming pools with an area of ​​1692.2 m² and 175.6 m².


built-up area
3090 m2

3259 m 3
concrete

492
piles

Project implementation timeframe: 2011 - 2013

Customer: State Public Institution “Directorate of Capital Construction and Investments of the Yamal-Nenets Autonomous Okrug”

General contractor: VIS Group

The group implemented a project to build one of the most modern kindergartens in the Yamalo-Nenets Autonomous Okrug in record time - one year and ten months. The new building has become a real decoration of this microdistrict of Salekhard, which was noted in his speech by the Governor of the Yamal-Nenets Autonomous Okrug Dmitry Kobylkin during his visit to the construction site.

The project also included landscaping of the area: planting pine trees, installing curbs, laying paving slabs, wooden coverings for children's playgrounds, paving and laying lawns. The total area of ​​the site is almost 9,000 sq. m. m.


built-up area
591 m2

904 m 3
concrete

103
piles

Project implementation timeframe: 2011 - 2012

Customer: State Public Institution “Directorate of Capital Construction and Investments of the Yamal-Nenets Autonomous Okrug”

General contractor: VIS Group

The medical building built by the Group consists of four floors and is connected to the rest of the clinic buildings by a warm passage. Everything necessary for the examination and treatment of children is provided here: from laboratories and physical therapy departments to offices psychological assistance. The building is specially equipped with salt caves, which is especially important in the climatic conditions of the Far North.

The VIS Group completed the entire range of construction and installation works, and also purchased medical equipment, including ultrasound systems, hydromassage baths and the only children's robotic system Lokomat in Salekhard.


built-up area
3168 m2

2713 m 3
concrete

96 t
metal structures

106
piles

Project implementation timeframe: 2014

Customer: State Public Institution “Directorate of Capital Construction and Investments of the Yamal-Nenets Autonomous Okrug”

General contractor: VIS Group

In August 2014, the Group won the open competition of the Directorate of Capital Construction of the Yamalo-Nenets Autonomous Okrug to complete the construction of a three-story kindergarten building with 300 seats. The project provided for the implementation of work on interior decoration and equipping the facility with all necessary equipment, as well as landscaping of the territory, including the development of night lighting for the building facades, the installation of decorative lamps and small architectural forms, and the planting of lawns.

A new preschool educational institution with a total area of ​​9000 sq. meters housed 17 groups, including 6 nurseries, 9 preschool and 2 speech therapy groups. For the comprehensive development of future pupils, the kindergarten has two music and physical education halls, its own theater studio with a costume department, a sewing workshop and a carpentry workshop. To keep children active in the fresh air, summer verandas, playgrounds and sports grounds have been designed.


built-up area
1096 m2

802 m 3
concrete

455
piles

Project implementation timeframe: 2012 - 2014

Customer: State Public Institution “Directorate of Capital Construction and Investments of the Yamal-Nenets Autonomous Okrug”

General contractor: VIS Group

The VIS Group acted as the general contractor for the construction of a two-story kindergarten building in Noyabrsk, designed for 120 places.

The total area of ​​the building is more than 2000 sq. m. meters.


built-up area
4887 m2

4110 m 3
concrete

1081
pile

Project implementation timeframe: 2011 - 2014

Customer: State Public Institution “Directorate of Capital Construction and Investments of the Yamal-Nenets Autonomous Okrug”

General contractor: VIS Group

In 2014, for the new school year, the largest boarding school in Tazovsky received a new dormitory building. The total area of ​​the building is more than 12 thousand square meters. m. The three-story building has a capacity of 260 people and includes bedrooms, rooms for preparing lessons, a dining room and a medical unit.

In addition to the main construction and installation work, landscaping of the adjacent territory was also carried out: children's playgrounds and sports grounds were installed, the area was illuminated, pedestrian sidewalks and driveways for service vehicles and firefighters were equipped.


total area of ​​the center
1.6 ha

88 m
façade length

739
piles

Project implementation timeframe: 2011 - 2015

Customer: State Public Institution “Directorate of Capital Construction and Investments of the Yamal-Nenets Autonomous Okrug”

General contractor: VIS Group

The group acted as the general contractor for the construction of the Sadko social rehabilitation center in Novy Urengoy.

This center, unique in its characteristics, is designed to provide social, psychological and other assistance to minors, their parents or legal representatives. Specialists in social rehabilitation will contribute to recovery social status minors and their return to their families.

The building of the center provides everything necessary for comprehensive assistance to those who apply: medical care premises, premises for psychological correction and social rehabilitation, an admissions department and administrative, utility and household premises with a catering unit and laundry.

The center is equipped with sports and assembly halls, a library with a reading room and book depository, a swimming pool, workshops for sewing and shoe repair. Here children will be taught the basics of modern information technologies, dancing and music, sewing and carpentry. The complex also includes two residential blocks - separately for boys and girls, including premises for disabled children. Each block contains common and sleeping rooms, a wardrobe and a dining room.

4871 m2
built-up area

30x61 m
ice field dimensions

718 t
metal structures

Project implementation timeframe: 2011 - 2015

Customer: State Public Institution “Directorate of Capital Construction and Investments of the Yamal-Nenets Autonomous Okrug”

General contractor: VIS Group

The group completed a full range of construction and installation works for the construction of a modern ice sports palace in Nadym. The total area of ​​the three-story building is about 6,000 sq. m. meters

According to the project, the ice arena is designed for 500 spectator seats, with specially equipped places for the disabled. On the ground floor of the building, in addition to the ice field with stands, there are locker rooms for hockey players, a gym with locker rooms and a sauna, a room for ice cleaning machines, and entrances for arena guests.

The second floor will house an acrobatics room, a room for trainers, and a television studio. Two VIP boxes and other administrative offices are located on the third floor. The project also provides an entrance for visitors involved in public skating, with a rental point, cabins and a changing room.

In the adjacent territory there is a convenient parking lot for 42 cars, of which 10 are for people with disabilities. disabilities. Lawns and other landscaping elements are provided.


total area more
23,000 m2

3000 people/day
training ability

2040
seats for spectators in the large hall

Project implementation timeframe: 2011 – 2016

Customer: State Public Institution “Directorate of Capital Construction and Investments of the Yamal-Nenets Autonomous Okrug”

General contractor: VIS Group

The completed Zvezdny sports complex is the largest international level site in Yamal. The total area of ​​the building exceeds 23,000 sq. m. meters.

Under the leadership of VIS Group specialists, the project has undergone a number of changes in order to comply not only with Russian, but also international standards. As a result, the layout and purpose of some premises were changed, special measures were taken to ensure fire safety, and the capacity of the large hall was expanded from 1600 to 2040 seats.

Today, the complex includes more than 10 specialized sports and universal halls, including a sports and entertainment hall, a games room, dance halls, aerobics, wrestling, boxing, weightlifting, table tennis, a gym and billiards hall, and a 25 and 50 meter shooting range. International and regional competitions in basketball, volleyball and mini-football, as well as classes in bullet shooting and shooting sports can be held here. The total training capacity per day is almost 3,000 people. The complex has created 130 specialized jobs, including instructors for working with children.

The complex has become not only a new level sports ground, but also a place for organizing cultural, entertainment and entertainment events. For this purpose, the Group’s specialists have installed the most modern multimedia equipment, allowing them to conduct any show programs. Special cladding panels in the large multi-purpose hall allow for high quality sound. There are also transformable stands that can be easily extended and retracted depending on the needs of event organizers.

On September 8, 2016, the opening ceremony of the new sports complex took place, in which the Secretary of the Security Council took part Russian Federation Nikolai Patrushev, Plenipotentiary Representative of the President of the Russian Federation in the Ural Federal District Igor Kholmanskikh and Governor of the Yamalo-Nenets Autonomous District Dmitry Kobylkin.

In total created 1540 new places for children and primary school students

Project implementation timeframe: 2013 - 2017

Public partner: Government of the Yamal-Nenets Autonomous Okrug

Private partner: VIS Group

This is the first public-private partnership project in the Yamal-Nenets Autonomous Okrug. Thanks to the involvement of a private investor - the VIS Group - the district was able to quickly solve the acute problem of lack of places in preschool institutions and create fundamentally new material and technical conditions for development modern system preschool and school education.

Construction of two kindergartens for 300 places each in Salekhard

Modern three-story buildings house 17 groups each, including nurseries and speech therapy groups. In addition, the buildings contain medical units, speleological chambers and swimming pools, where pupils learn to swim and undergo special health courses.

To organize children's leisure time, art studios, theater workshops, computer classes and choreography rooms have been set up.

On the third floor of kindergartens there are winter gardens, planetariums, and halls for music and physical education classes.

Construction of a kindergarten for 240 places in Novy Urengoy

The total area of ​​the building is more than 7.5 thousand square meters. meters. The three-story kindergarten contains group cells, a swimming pool, 2 winter gardens, sports, assembly and music halls, a choreography hall and medical premises with a physiotherapist's office. For the convenience of little Novy Urengoy residents, an elevator is installed, as well as outdoor covered and open walking verandas.

The building was equipped with modern technologies, safety system. Interactive whiteboards have also been installed, computer classes have been equipped, and interactive floors have been installed.

Construction of a kindergarten for 80 places in the village. Gorki

The kindergarten was built in the south-eastern part of the village of Gorki. The total area of ​​the building is more than 3200 sq. m. m, it comfortably accommodates 80 pupils.

The territory of the kindergarten is equipped with playgrounds for groups, a general physical education area and ring paths for cycling.

Construction of a kindergarten for 300 places in Tazovsky

The standard construction project developed for kindergartens in Salekhard was also used in the construction of a kindergarten for 300 children in Tazovsky - the kindergarten became one of the most modern in the city.

Much attention is paid to organizing children's leisure time and their all-round development. Here preschoolers are taught to dance, draw and sing. A separate area of ​​work for teachers will be teaching children how to use a computer. Taking into account the climatic characteristics of the region in the building in mandatory a speleological chamber and a swimming pool are arranged.

Construction of a single school building and kindergarten for 200 and 120 places in Muravlenko

The modern building consists of two buildings, which comfortably house a kindergarten and a school with 120 and 200 seats, respectively. The total area of ​​the educational institution was more than 11 thousand square meters. m.

PROJECT READINESS

Project implementation timeframe: 2015 – 2018

Public partner: Government of Khanty-Mansi Autonomous Okrug - Ugra


Private partner: VIS Infrastructure LLC

In December 2014, the VIS Group (represented by its subsidiary VIS Infrastructure LLC) and the Department of Health of the Khanty-Mansiysk Autonomous Okrug - Ugra signed an agreement on public-private partnership for the design, construction, equipment and technical operation of a clinical perinatal center in Surgut .

The new high-tech center will provide comprehensive services in the field of childbirth support, advanced treatment and prevention of intrauterine diseases, and neonatal surgery. Unlike a regular maternity hospital, they will be able to diagnose and treat complex diseases in mothers and babies using robotics and the most modern medical equipment.

According to the project, the building of 3 blocks is designed for 10 thousand births per year. At the same time, the institution will be able to accommodate more than 300 women in labor. The complex's hospital has several maternity wards, an operating unit for 15 operations at a time, and intensive care units for mother and child.

A separate area of ​​work will be a consultative and diagnostic center. A mammology center will be organized here, equipped with MRI and computed tomography rooms, as well as a department of reproductive technologies with an IVF laboratory, the expansion of which is long awaited by Surgut doctors. There will also be jobs for ophthalmologists, dentists, endocrinologists, urologists and many others.

The Department of Obstetrics and Gynecology will operate on the basis of the new perinatal center. A simulation and training center with a maternity ward, operating rooms, resuscitation and intensive care units was designed specifically for student practice. Equipment for classrooms, computer classes, a conference room with 120 seats, a library and an archive is provided.

Construction time frame for such an important project for the region social object maximum compressed – 3 years. The total area of ​​the center will be more than 60 thousand square meters. meters. It is expected that by the time it is put into operation in 2018, this center will become the largest in Russia.

The public-private partnership agreement provides for the operation of the perinatal center for 7 years after commissioning.

PROJECT READINESS

Project implementation timeframe: 2017 - 2019

Grantor: Government Novosibirsk region


Concessionaire: Ecology-Novosibirsk LLC

In September 2017, VIS Group acquired 75% of Ecology-Novosibirsk LLC. The company acts as a concessionaire for a project to build waste sorting complexes and all related infrastructure in the Novosibirsk region.

The corresponding concession agreement was concluded in July 2016 between Ecology-Novosibirsk LLC and the Regional Government. The project includes two waste sorting plants for household waste with a capacity of 400 thousand tons each, two landfills with a capacity of 297.2 thousand tons each and all the necessary infrastructure. The agreement was concluded for a period of 40 years.

The construction of the complexes is planned to be carried out at the expense of the concessionaire; investments will amount to about 6.5 billion rubles. Both plants will become the property of the region immediately after completion of construction; their operation for the duration of the agreement (until July 2056) will be carried out by the concessionaire.

PROJECT READINESS

Project implementation timeframe: 2016 – 2019

Public partner: Government of the Republic of Sakha (Yakutia)

Private partner: Gazenergomontazh LLC

In December 2015, the VIS Group became the winner of an open competition of the Ministry of Economy of the Republic of Sakha (Yakutia) for the right to conclude an agreement on public-private partnership for the design, creation and maintenance of preschool, general, additional education and culture in the city of Yakutsk.

Construction of the International Arctic School for 220 places

An educational building of the International Arctic School will be built on the territory of the Sosnovy Bor Recreation and Health Center. Six blocks of different heights, including a separate sports block, will be designed for 220 students. The total area of ​​the building will exceed 7200 sq. m. meters.

The layout of the future educational center provides for the organization of the most comfortable learning process for all groups of schoolchildren. Own laboratory assistants will be created in the classrooms of biology, chemistry and physics, as well as computer science. The library with a spacious book depository and reading room will fully meet the school's needs for educational literature. Students will be able to relax during recess in a spacious lobby with a fountain and in a recreational area with a winter garden. There will also be space for an open training center.

To hold creative meetings, an assembly hall with a costume room and space for scenery and props will be built. Individual music lessons will be organized at the school, for which piano, string and wind instrument classes will be provided. For scientific events, a modern multimedia conference room for 50 people will be created in the academic building. The school will also have its own planetarium, a museum of Arctic civilization and a film projection room.

Sports life will be organized in a separate block, which will house a spacious swimming pool, sports and dance halls. To organize classes, there are equipment, coaching rooms, locker rooms and showers for boys and girls. Along with the pool, swimming and foot baths will be created to prevent children's health. Water quality control will be carried out in a special analysis laboratory located directly in the building.

On the landscaped territory of the school there will be grounds for outdoor and sports games - basketball, volleyball, football and gymnastics in combination with sectors for long and high jumps.

Construction of the national school “Aiyy Kyhata” for 550 places

The national school “Aiyy Kyhata” will be located in microdistrict 203 of Yakutsk. In the three-story building, the project provides everything necessary to ensure a smooth and convenient learning process. Conditions will be created here for classes not only according to the school curriculum, but also for attending additional clubs, participating in the life of public organizations and holding sporting events. The school is designed for eight grades 1-4, ten grades 5-9 and four grades 10-11. Comfortable class sizes are provided with the number of students not exceeding 25 people. Primary and secondary schools will have separate dance and sports halls with equipped locker rooms and showers.

The goal of implementing the PPP project in Yakutsk is, among other things, to improve the material and technical base of the education and cultural sectors of the city. Following this goal, the school will create multimedia classrooms with interactive whiteboards for classes, lecture halls, language labs, laboratory rooms and a workshop on electrical technology. Art education for schoolchildren will be organized in its own folk theater-studio with a costume room and dressing rooms. There is also a room for singing and folk instruments. In addition to the standard medical block, there will be a private dental office, a psychologist’s office and a social teacher’s office.

In the adjacent territory it is planned to create playgrounds and sports grounds for different age groups. Sports grounds will be made of injury-proof coating that is harmless to children’s health. The site has designed spaces for various types games: basketball, volleyball, football, and gymnastics. There will be running tracks and areas for quiet recreation around the football field and basketball court.

Construction of a multifunctional entertainment complex - House of Culture named after. Yu.A. Gagarin with a cinema and concert hall for 500 seats

House of Culture named after. Yu.A. Gagarin is intended to become one of the centers of cultural and business life of the city. Equipped with the most modern multimedia and sound equipment, this multifunctional entertainment complex will house not only clubs and clubs, but also office and retail premises.

The total area of ​​the building exceeds 6000 sq. m. meters. On the ground floor there will be a cinema and concert hall with a stage and seats for 500 spectators. For open meetings there is a large hall with a cafe and dressing rooms. The second floor will be occupied by a children's leisure center, a library with a reading room, a teenager's club, a winter garden, a dance hall, as well as a club with a multi-purpose hall with a capacity of 250 visitors. On the third floor there will be rooms for creativity: an artist’s room, workshops and rooms for various clubs.

Sidewalks and driveways will be built in the adjacent territory, and safe traffic will be organized. The project provides for the creation of night and day lighting for the complex's facilities: floodlights for walking areas, street and park lamps of soft light will be installed. Additionally, landscaping and improvement of recreation areas for citizens will be carried out.

Construction of a children's art school with a concert hall for 300 seats

As a result of the project, a new children's art school will appear in microdistrict 203 of Yakutsk. The building has three floors with a total area of ​​more than 4,500 sq. m. meters will be able to accommodate up to 300 students, providing everything necessary for a wide variety of classes. There will be 3 classrooms for group music theory classes, 23 classrooms for individual lessons, a multi-purpose hall, a stage, a costume and artistic room.

Young residents of Yakutsk will be able to enroll in dance and theater clubs, as well as learn to play at national musical instruments, including khomus. The VIS group will supply the school with all the necessary musical equipment, including world-famous brands such as Yamaha, Wisemann and Hohner.

Landscaping and outdoor lighting of the art school are provided according to an individual design project. The landscaped area of ​​the new children's creativity center will become a place of comfortable leisure time for students and their parents.

Library construction

The formation of a new cultural environment in the 203rd microdistrict of Yakutsk will be complemented by the construction of a library with a book depository volume of 130 thousand volumes. The library's collection will consist of both works from the extensive school curriculum and popular fiction by Russian and foreign authors. There will be separate reading and subscription rooms for primary, middle and high schools, as well as a leisure sector and a games library for the little ones. The artist’s offices and various clubs will operate all year round. Additionally, provision is made for the creation and completion of an Internet class.

You can have a pleasant time in the cafe, located directly on the premises of the building and designed for 50 people. A reading research center with scientific and methodological departments, a department of psychology, sociology and pedagogy of children's reading will operate on the basis of the library.

The project provides for providing the library with everything necessary for comfortable operating activities. The need for restoration and repair of books will be provided by its own department of technical creativity, and the publishing and duplicating laboratory will allow printing and copying the necessary works.

Construction of school No. 25 for 350 places

A school for middle and high schools will be built on Yakov Potapov Street in the 92nd microdistrict of Yakutsk. Three-story building with an area of ​​more than 6,000 sq. meters is designed for 350 seats.

In addition to the standard school curriculum, students will be helped with career guidance and prepared for entry into higher education. educational establishments and develop useful skills. The school will have its own library with a reading room, a sports hall and an assembly hall with a costume and artistic room. For the comprehensive development of schoolchildren, there will be classes of Russian national culture and the culture of indigenous peoples, a computer class, as well as a primary military training room with a weapons storage room.

All educational and cultural institutions are built by the VIS Group in accordance with high energy efficiency requirements, modern materials in the external and internal decoration of premises, it is planned to install ventilated facades and cover them with porcelain stoneware. For access by groups of citizens with limited mobility, ramps with non-slip surfaces are installed.

Construction of school No. 6 for 500 places

The three-story building of school No. 6 on Avtodorozhnaya Street in the city of Yakutsk is designed for 500 students. The total area will be more than 8 thousand square meters. meters.

All age groups from primary to high school will be trained here. There is a stream of eight grades 1-4, ten grades 5-9 and two grades 10-11. The students’ livelihoods will be fully provided by the building’s production facilities: classrooms and laboratory facilities equipped with modern equipment, including language labs and lecture halls, its own kitchen and spacious dining room, and well-appointed recreational areas. For active activities there are assembly, sports and gymnastics halls.

The interior decoration of all premises is made from natural materials, harmless to health. Security and Fire safety Students and teachers will be provided with the most modern equipment and CCTV cameras along the entire perimeter of the school.

Construction of 2 kindergartens for 315 places

Two modern kindergartens with 315 seats each will be built in microdistrict 203 of Yakutsk, which will fully meet the needs of the surrounding areas. Executed by individual design projects, both buildings will be designed for 18 groups, including nurseries, speech therapy and preschool. Three-story buildings with an area of ​​more than 4,500 square meters. meters each, there will be group cells equipped with toys and educational materials, equipped with elevators, and a separate computer equipment room will be created. Spacious physical education and music rooms will be provided, and in the second kindergarten an additional swimming pool will be created to teach preschoolers swimming. Own carpentry workshops for girls and boys will help teachers conduct classes with benefit and interest.

The medical units of kindergartens are equipped with modern equipment, including the most necessary things - height meters, devices for determining flat feet in children, spirometers and much more. Speech therapist and psychologist offices will operate on a permanent basis in kindergartens.

On the adjacent site there will be areas for outdoor games for junior, middle and senior group respectively, for sports games, as well as an area for quiet relaxation. The project provides for ensuring safe traffic on the territory of kindergartens, installing external day and night lighting.

Construction of a kindergarten in the village of Syrdakh for 240 children

The PPP project also provides for the construction of a kindergarten in the village of Syrdakh, located 82 kilometers north of the capital of the republic. Built to high specifications modern construction and according to the standard design of urban kindergartens being built in Yakutsk, the building will be able to accommodate up to 240 pupils at a time. Its total area is more than 3500 square meters. meters.

In addition to group cells designed for 12 nursery, preparatory, middle and senior groups, there will be a carpentry workshop and a sensory room, an additional education room, physical education and choreography rooms, a room for music classes, a stage and a children's theater. The medical block will have speech therapist and psychologist offices, as well as a psychological training room. The methodological work of teachers will be carried out in an office with an Internet library.

Outdoor areas, as well as walking verandas, will be equipped with everything necessary for organizing pupils’ leisure time. Each playground and sports ground will be covered with a special dust-free coating that is harmless to the health of children. Integrated landscaping and arrangement of flower beds and lawns will improve the entire surrounding area.

Construction of kindergarten No. 75 “Ivushka” for 240 places

Kindergarten “Ivushka” on the street. Ilmenskaya in the 75th quarter of the city will accept up to 240 students. The total area of ​​the building is 3500 sq. m. meters. Three floors will house group cells for nursery, preparatory, middle and senior groups.

There will be a general gym and dance hall, a swimming pool, and a hall for music classes. To develop coordination, fine motor skills and creative thinking The kindergarten will have a carpentry workshop, a sensory room and an additional education room. On the adjacent territory there will be walking verandas for the winter period, as well as summer sports and playgrounds for each age group. Additionally, a children's theater will be created, where teachers will be able to engage in theater arts with preschoolers and create their own productions.

Construction of kindergarten No. 30 for 200 places

Kindergarten No. 30, designed for 200 places, will be built on Pionerskaya Street. There will be 11 groups working here, including nurseries and speech therapy. The number of students does not exceed 15 people in junior groups and 20 people in senior groups, which is optimal from the point of view of ensuring a comfortable learning process for both teachers and children.

The total area of ​​the building will exceed 3400 square meters. meters. On three floors there will be play areas, sleeping and study areas, a gym for physical education, a music room and a theater studio. For the comprehensive development of children, classrooms for computer technology and fine arts will be installed. The project also provides for the construction of a swimming pool with an area of ​​21 square meters. meter, where older students will be able to undergo swimming training with professional trainers. The medical block, among other things, will be complemented by a physiotherapy room, a dentist’s office, a psychologist and a speech therapist. There will be a separate sensory room.

General contractor: VIS Group

In December last year, the VIS Group took over the unfinished building of a kindergarten for 330 places in microdistrict No. 9 of Gubkinsky.

The two-story kindergarten is designed for 330 students. The total area of ​​the territory is more than 16,000 square meters. m. 20 groups will work here, including nurseries, adaptation and preparatory groups. In addition to working classes, a traditional swimming pool for Yamal preschool institutions, sports and assembly halls, a computer and games room, and a separate medical block are also designed here. The improvement of the vast territory includes the construction of sports and playgrounds, architectural forms, landscaping lawns and planting flower beds.

For the municipal authorities, the problem of completing the construction of the kindergarten was quite acute. After the Group’s specialists arrived on site, it was decided to make adjustments to the design estimate documentation taking into account the requirements of modern safety standards and equipment of such facilities. In addition to the full interior decoration and technical equipment, work includes strengthening load-bearing structures frame, replacement of interfloor floor slabs, dismantling of the entire floor structure.

Customer: State Public Institution “Directorate of Capital Construction and Investments of the Yamal-Nenets Autonomous Okrug”

General contractor: VIS Group

The “Doverie” social rehabilitation center, being built by the VIS Group in Salekhard, is intended to become a place of comprehensive assistance to children and adolescents, as well as families with children who find themselves in difficult life situations, and the prevention of neglect and homelessness of minors.

The total area of ​​the three-story building, designed for 100 people, is almost 12 thousand square meters. m. The center provides everything necessary that may be needed for the implementation of social rehabilitation programs. There will be 5 groups for children from 3 to 15 years old with the possibility of round-the-clock stay, 6 day care groups - three of them for disabled children. There is also a crisis department and a rehabilitation stay department to provide emergency medical and psychological assistance to those who apply. SRC “Doverie” will also accept children who have left dysfunctional families without permission and will contribute to their social rehabilitation.

The center's employees will be educators, social pedagogues, psychologists, speech therapists, lawyers and local social services. Computer classes, games and relaxation rooms, psychological and speech therapy rooms will be organized here. A separate area of ​​the center’s work will be providing medical care: the construction of sports and gyms, a swimming pool, massage and exercise therapy rooms, a sauna, an inhalation room, a fotaria and a herbal bar is envisaged.

The building will house assembly and conference halls with all the necessary multimedia equipment, a choreography hall, an art studio, a sewing workshop, labor rooms and its own library with a book depository.

The territory of the center will be divided into functional zones in order to ensure unhindered recreation for children and adolescents. Sports and playgrounds and a winter walking veranda have been designed.

contractor: VIS Group

The building of the State Archive of the Yamal-Nenets Autonomous Okrug is designed to be 5-story and designed to store documents in the amount of 265 thousand files. The complex of main and auxiliary premises includes archive storage, work rooms for archive staff, a research and reference library with a reading room, an exhibition hall for 100 people, a conference room for 70 people and other premises. It is planned to illuminate the facades of the building at night and install decorative lamps.

The project provides for the improvement of the surrounding areas: the implementation of small architectural forms, fencing of lawns and lighting of the courtyard area. Additionally, a parking lot will be organized for parking vehicles of employees and guests of the archive.

Civil Engineering is a capital construction industry that involves the construction of non-production facilities, which include: residential, office and administrative buildings, educational, healthcare and cultural facilities, housing and communal services and public catering, as well as sports facilities, shopping, entertainment and hotel complexes. Thus, civil Engineering differs in a huge variety of directions, materials and designs used and requires constant updating of technologies.

Despite the fact that the volume and pace of construction of facilities in civil engineering have not yet fully recovered from the crisis in the Russian economy, the industry's prospects are favorable. IN Lately in Russia the procedure for providing and processing land plots under construction, and this is a necessary condition successful development of the industry.

The main direction of civil engineering is housing construction . Providing the population with quality housing is one of the main government tasks. Focusing on solving this problem, the constituent entities of the Russian Federation formulate urban planning policies. These actions are gradually yielding results - the volume of housing being built is growing.

Development prospects civil engineering in Russia related to the general economic situation in the country and regions. Construction of civil facilities - residential buildings, shopping centers, sports grounds, stadiums, educational institutions, hospitals, museums, theaters - is directly related to the well-being of people. The development of this industry is the main indicator of the quality of life of the population of our country.

Construction of civil facilities

For "Engineering Company "2K" civil Engineering one of the priority industries, since we have accumulated many years of successful experience in providing services in this area. "Engineering Company "2K" provides a range of services of the highest quality in the field civil engineering. Thanks to the accumulated experience, we provide services in the process of constructing complex engineering structures. When implementing projects, we use our unique developments.

In area housing construction

  • construction management of residential microdistrict No. 7 in Odintsovo;
  • management of the construction of a residential microdistrict in Naro-Fominsk;
  • control audit residential complex"Olympus" in Korolev;
  • control and audit inspection of a multi-storey residential building in Novosibirsk;
  • control and audit inspection of the residential microdistrict "Gusarskaya Ballad" near the village. Oak trees;
  • control and audit inspection of the Pirogovo residential complex in Sochi.

In area construction of office and administrative buildings We participated in the implementation of the following projects:

  • management of the construction of an office center in the Central Administrative District of Moscow;
  • technical supervision of the construction of an office center in Chelyabinsk;
  • control and audit inspection of an administrative building in Yekaterinburg;
  • drawing up estimates for the reconstruction of the domes of the main building of LUKOIL in Moscow.

In area construction of shopping and entertainment complex facilities We participated in the implementation of the following projects:

  • construction management of the Perlovsky shopping center in Mytishchi;
  • technical supervision of the construction of a shopping and entertainment complex in Ufa;
  • control and audit inspection of the Petrovsky Passage shopping center in Voronezh.

In area construction of social facilities Engineering Company "2K" participated in the implementation of the following projects:

  • drawing up estimates for the restoration and reconstruction of the facades of the institution “House-Museum of Matvey Muravyov-Apostol”;
  • control and audit inspection of educational buildings and dormitories of the St. Petersburg University of Engineering and Economics (SPbGIEU);
  • technical inspection of municipal educational institutions of the Stupinsky district.

In area construction of public catering facilities we participated in the following projects:

  • technical supervision of the construction of the restaurant chain "Rosinter RESTAURANTS" LLC (trademark "Rostiks");
  • control and audit inspection of the McDonald's restaurant in the Moscow region.

In area construction of sports infrastructure facilities We participated in the implementation of the following projects:

  • preparation of estimate documentation and control and audit inspection of the apartment complex of the Pestovo golf and yacht club;
  • control and audit inspection of premises for the placement of sports and health clubs "Planet-Fitness".
Share with friends or save for yourself:

Loading...